As our largest project to date, this job highlights our capability to take on massive, high-impact builds. We delivered over 3,600 tons of structural steel for a 675,000 square foot tilt-wall facility, including a four-story steel tower and a 30,000 square foot mezzanine. Our team also designed and fabricated custom CV line tube supports throughout the tower and mezzanine to accommodate specialized German equipment. This project demonstrates our ability to handle large-scale operations, custom engineering requirements, and precision fabrication—all while delivering dependable, high-quality results.
Project Review
Encore Wire Plant 5
Total Steel Tonnage
Beyond its impressive scale, this project exemplifies our strength in solving complex construction and integration challenges. The custom support systems required close coordination between our engineering, detailing, fabrication, and field teams to ensure seamless compatibility with highly specialized manufacturing equipment. Managing the production, delivery, and installation of thousands of tons of steel demanded meticulous planning and execution, with every component fabricated to exact specifications. The successful completion of this facility reinforces our reputation as a trusted partner for large industrial projects, capable of combining innovative engineering solutions with the capacity and expertise needed to meet the demands of world-class manufacturing environments.
Address
1234 Divi St. #1000
San Francisco, CA 29362
Phone
(346) 234-5675
info@divielectric.com

